Lake Texoma historic maps
Historic map overlays for Burns Run, Carver Camp, and Sunset Camp.
Details
1940s Corps of Engineers and National Park Service plan sheets, fitted by hand to today’s lake and topography on Corps of Engineers land. Also a vicinity map and a travel map of the historic Black towns of Oberlin, Sherman, Macedonia, and Wiley.
Deliverable: Historic overlay maps, vicinity map, and town road map
Jogloma-Scott Lake Bridge as-built GIS
A surveyor’s drawing rebuilt into eight GIS layers: 79 new trail structures, 651 trees with species and size, and 794 survey points.
Details
The field survey is the surveyor’s work. We built the GIS for the Forest Service INFRA database, with each structure’s type, trail milepost, material, and install date.
Deliverable: GIS delivery in NAD83 Alabama East with FGDC metadata, a data dictionary, a QC log, and a README, October 2026; kiosk and directions maps, 2025
Pinhoti Trail table maps
Seven trail-themed table maps of places along the Pinhoti Trail, plus a full-trail map.
Details
Flagg Mountain, Terrapin Creek, Jogloma-Scott Lake, the Chief Ladiga Trail, Cheaha State Park and Wilderness Area, Heflin, and Coleman and Sweetwater Lakes.
Deliverable: Print-ready table maps, October 2024
Pinhoti Trail field inventory
17 trail bridges inventoried, plus shelters and trailheads.
Details
Field work ran February to June 2025.
Pinhoti Trail kiosk maps
A 36 x 48 in full-trail print map and Flagg Mountain kiosk maps.
Details
Deliverable: Print-ready maps, September 2025
Bankhead watershed maps
Maps of the Owl Creek Trailhead, the horse loops, and Sougahoagdee Falls.
Details
Brushy Creek watershed project locations and general vicinity maps.
Deliverable: Watershed and vicinity maps, 2026
University trail maps
Trail maps for the University of West Alabama and Kreher Preserve and Nature Center.
Details
Black Belt Garden Trails and Lake LU (24 x 36 in, July 2025) and Kreher Preserve and Nature Center in Auburn (June 2026).
Deliverable: Print maps
Air Force Academy cemetery EA
Natural resources and GIS for the Environmental Assessment and FONSI.
Details
Jacob Richards was the natural resource specialist and did the GIS for the cemetery expansion EA.
Document: Final EA and FONSI, December 2023
Fort Bliss vehicle EA figures
Vicinity, roads, soils, geology, and land use figures.
Details
Joint Light Tactical Vehicle Environmental Assessment.
Deliverable: Figures for the final EA, November 2022
Fillmore Canyon EA figures
Figures for opening about 2,035 acres to public outdoor recreation.
Details
Parcel D, under the 2019 Dingell Act.
Deliverable: Final EA figures, 2023
Jogloma-Scott Lake Bridge NEPA support
NEPA support and Forest Service coordination; categorical exclusion signed January 2025.
Details
The Alabama Trails Foundation proposed the project. We supported the NEPA review and were the point of contact during the trail work.
Outcome: Forest Service categorical exclusion decision memo signed, January 2025
Master geodatabase
1,118 layers in one place, each with a catalog entry.
Details
A catalog records each layer’s title, theme, status, source, date, and a sensitivity note.
Deliverable: Geodatabase and layer catalog, September 2026
File consolidation
Files from three drives sorted into one structure.
Details
Date-first names, old drafts zipped, and a move log.
Deliverable: Reorganized files with a move log, September 2026
Website rebuild
A 32-page tour site rebuilt, with a working booking form.
Details
Mobile Book, WhatsApp, and Call bar; a booking form that saves every request and emails the guest; interactive dive, snorkel, fishing, and day-trip maps; 1,887 spam comments cleared out.
Deliverable: belizemagicaladventures.com, October 2026
Regional recreation planning maps
Statewide planning region and regional recreation opportunity maps.
Details
Planning region (SCORP) and recreation opportunity maps for UACED, through the Alabama Trails Foundation. Earlier work, before Eyes of the World.
Deliverable: Final maps, August 2021
Pinhoti Trail sections map
The Alabama Pinhoti in 13 sections measured from the walked line, 172.9 miles, with an elevation profile and a mile-by-mile list of stops.
Details
Made in 2026 from the same trail data as the 2025 print map. When the trail data changes, we can remake it.
Deliverable: Print map, October 2026
Pinhoti Counties visitor map
The six Pinhoti counties with 18 places to go, 13 gateway towns, and 12 Chief Ladiga Trail access points.
Details
A visitor and partner map for the counties the trail crosses, made from the same trail and recreation data as the sections map.
Deliverable: Print map, November 2026
Rush-Brushy support maps
Rings at 30, 60, 90, and 120 miles around the project, with the people inside each ring counted from 2020 Census blocks.
Details
Made for a fundraising case.
Deliverable: Support maps, November 2026
Grant and report library
Years of applications, reports, and GIS turned into catalogs that start the next application, report, or map.
Details
We keep four catalogs: 402 earlier answers from 44 applications and reports, sorted by topic and outcome; 50 organization facts with their sources; 30 kinds of attachments and where each one lives; and the master layer catalog. The next application or report starts from these.
Deliverable: Grant start kit with its libraries and a README, version 1.2, October 2026
Grant lessons from past applications
We compared 24 past grant applications, 14 funded and 10 not, and turned what the awarded ones did into a checklist for every new draft.
Details
Awarded applications tied their answers to the local economy (13 of 14, against 2 of 10 not awarded), named 10 or more partners, and said how results would be measured. Applications that were not awarded repeated themselves and kept their answers short. The checklist now goes with every new draft.
Deliverable: Lessons report and a 10-point checklist, September 2026
Flagg Mountain figure set
13 figures from one project point in one run: vicinity, topo and imagery, congressional and state legislative districts, county, trails and recreation, infrastructure, action area, waters and wetlands, soils, and watershed.
Details
Each figure pulls its layers from the master data library. The district figures show who represents the project area, which helps with a grant or a letter of support.
Delivery zone pipeline
12 delivery zones, one KMZ file each, from a repeatable process.
Details
We cleaned the Google Earth zones, built a GIS database, and wrote one KMZ file per zone.
Deliverable: GIS database and zone KMZ files
River maintenance drone mapping
Drone video, stills, and GIS mapping of river maintenance work.
Details
We pulled still images from the drone video and mapped the work features in GIS.
Deliverable: Drone imagery and an ArcGIS Pro project
Air Force training Biological Assessment
Biological Assessment for Air Force survival training, as sole preparer.
Details
Fairchild AFB SERE (Survival, Evasion, Resistance, and Escape) training.
Deliverable: Final Biological Assessment, March 2025
Fort Cavazos programmatic EA
Natural resources support.
Details
Weapons Modernization Programmatic Environmental Assessment.
Document: Final Programmatic EA with FONSI, public version, June 2025
US 78 bridge survey support
Drafting and GIS support for the biological survey report.
Details
For the Forest Service proposal. The bridge is proposed and has not been built.
Deliverable: Survey report support and maps, 2026
Statewide and national applications
Applications to statewide and national funders for trail planning and programs.
Details
Flagg Mountain visitor engagement planning, the 100 Alabama Miles Challenge, and community and corporate grant programs.
Deliverable: Applications
Foundation grant writing
A grant writing proposal and a first application.
Details
Funding research, a grant calendar, applications, and tracking for a foundation starting its grant program, with the first application in November 2025.
Deliverable: Proposal, October 2025; application, November 2025
Trail project management
Point of contact for Jogloma-Scott Lake Bridge and Forest Service liaison.
Details
Managed trail improvements, the Jacksonville State University partnership, and event mapping for the Year of Alabama Trails.
Deliverable: Project management
Flagg Mountain visitor analysis
Motion counters and visit data for the Pinhoti Trail’s southern end.
Details
Counters installed in 2021 and visit data from 2017 to 2023 show spring and fall peaks.
Deliverable: Visitor analysis
GIS project repair
Broken layers cut from 104 to 3.
Details
Relinked and reorganized so the next person starts from a working project.
Deliverable: Organize notes, September 2026
Pinhoti Trail GPS survey
678 waypoints and 27,195 track points from a 2017 survey, turned into feature inventories.
Details
Inventories of bridges, shelters, kiosks, signs, trailheads, and vistas, and a maintenance report by trail section in 2019. Jacob Richards supervised the data collection and analysis. Earlier work, before Eyes of the World.
Deliverable: GIS feature inventories and a maintenance report, 2019
See something like your project?
Tell us about it.