Lens 03 · Services

Compliance Maps

The figures behind NEPA documents, biological surveys, wetland and permit applications, and trail planning. We draw the vicinity, project area, roads, soils, geology, and land use for the agency reviewer.

Drawer 03

What’s in this drawer

You bringProject plans and site dataparcels, designs, and survey notes
We buildThe figure setfrom vicinity to land use, in one style
You getFigures ready for the documentand the GIS data behind them

Sample maps

Compliance maps we make

See it in the map gallery
Sample compliance screening map of the Tweetsie Trail in Tennessee, showing mapped streams, wetlands, flood zones, and 13 numbered stream crossings along a 100 ft corridor.
Tweetsie Trail Resource ScreeningWhere might trail work need a permit check?

The maps

Click any map or photo to see it full size.

3 images

Fort Bliss vehicle EA figures

Chloeta · Fort Bliss, Texas · 2022

Vicinity, roads, soils, geology, and land use figures.

Details

Joint Light Tactical Vehicle Environmental Assessment.

Deliverable: Figures for the final EA, November 2022

Fillmore Canyon EA figures

Chloeta · Fort Bliss, New Mexico · 2023

Figures for opening about 2,035 acres to public outdoor recreation.

Details

Parcel D, under the 2019 Dingell Act.

Deliverable: Final EA figures, 2023

Regional recreation planning maps

Alabama Trails Foundation · Alabama · 2021

Statewide planning region and regional recreation opportunity maps.

Details

Planning region (SCORP) and recreation opportunity maps for UACED, through the Alabama Trails Foundation. Earlier work, before Eyes of the World.

Deliverable: Final maps, August 2021

Pinhoti Counties visitor map

Alabama Trails Foundation · Coosa to Cherokee Counties · 2026

The six Pinhoti counties with 18 places to go, 13 gateway towns, and 12 Chief Ladiga Trail access points.

Details

A visitor and partner map for the counties the trail crosses, made from the same trail and recreation data as the sections map.

Deliverable: Print map, November 2026

See every Compliance Maps project

Why we can do it

We have written the sections these figures illustrate. We worked in natural resources and GIS roles on federal Environmental Assessments, prepared a Biological Assessment, supported a Forest Service categorical exclusion, and gave drafting and GIS support on a biological survey report.

5final federal NEPA and ESA documents
4military installations served: Fort Bliss, Fort Cavazos, the Air Force Academy, and Fairchild AFB

Air Force Academy cemetery EA

Chloeta · Colorado Springs · 2023

Natural resources and GIS for the Environmental Assessment and FONSI.

Details

Jacob Richards was the natural resource specialist and did the GIS for the cemetery expansion EA.

Document: Final EA and FONSI, December 2023

Jogloma-Scott Lake Bridge NEPA support

Alabama Trails Foundation · Talladega National Forest · 2025

NEPA support and Forest Service coordination; categorical exclusion signed January 2025.

Details

The Alabama Trails Foundation proposed the project. We supported the NEPA review and were the point of contact during the trail work.

Outcome: Forest Service categorical exclusion decision memo signed, January 2025

The Log

We go look.

ENTRY 01

Gather

The project description, designs, parcels, and the agency’s species lists and data.

ENTRY 02

Map

The full figure set in one style.

ENTRY 03

See it through

Revise with the project team and the reviewer until the document is final.

On trails and public lands: NEPA support for the Jogloma-Scott Lake Bridge project on the Talladega National Forest, survey report support and project maps for the proposed Pinhoti Trail bridge over US 78, and figures for the Fillmore Canyon EA at Fort Bliss.

Who it’s for

Federal contractorsthat need maps and GIS for NEPA and ESA documents.
Trail organizationsthat work with the Forest Service and other land managers.
Nonprofitsplanning land protection or new trail.

Have a project in mind?

Tell us what you are working on and what you need at the end.

START A CONVERSATION